Triage first, then price
A per document price assumes documents are alike. They are not. Sorting the 60 tested documents by how many checks they fail produces four tiers whose costs differ by an order of magnitude.
| Tier | Definition | Documents | Effort | Note |
|---|---|---|---|---|
| Tier 0 | Passes all four structural checks | 31 | No structural work | Still needs a human pass for alternative text quality, reading order, table header association and contrast. Automated checks do not see any of those. |
| Tier 1 | Fails one check | 17 | Minutes per document | Almost always a missing title or language. Batch automatable with a sample verified by hand. |
| Tier 2 | Fails two or three checks | 5 | Up to an hour per document | Tag tree rebuild plus metadata. Automatable first pass, then reviewed. |
| Tier 3 | Fails all four checks | 7 | Several hours per document | Scanned images. OCR, then structure, then review. The expensive tier, and the one a flat per document price gets wrong. |
Why Tier 0 is not finished work
31 of 60 passed all four structural checks. That does not make them accessible. It makes them eligible for the human review that decides whether they are. A contract that reports Tier 0 as compliant is reporting the wrong number.
The lifecycle
Seven steps, each with an owner. The City asked for document compliance and for reporting and tracking; those are not two activities, they are the same activity observed.
| Step | Who does it | What happens |
|---|---|---|
| 1. Detect | Automated | A scheduled crawl of the City's published pages finds every linked document and records where it was found. New and changed documents enter the queue the same day. |
| 2. Test | Automated | Structural checks on every document, plus a full WCAG 2.1 AA evaluation on the ones that reach remediation. Results are stored per document and per version. |
| 3. Triage | Automated, confirmed by a person | Each document lands in a tier. The tier decides the route, the effort and the price. Scanned images are separated here, before anyone commits to a turnaround. |
| 4. Remediate | Tool assisted, person accountable | Tagging, reading order, language, titles, alternative text, table headers and form labels. The tool does the first pass. A person signs the result. |
| 5. Verify | Person | Checked against the four structural criteria and then read with a screen reader. A document is not compliant because a tool says so. |
| 6. Republish | City controlled | The remediated file is returned to the City with its original address preserved, so no link anywhere on the site breaks. |
| 7. Monitor | Automated | The document is re-tested on a schedule. A document that is replaced by an untagged version is caught rather than assumed to be still compliant. |
The step most programmes leave out
Monitoring. A document is remediated, republished and marked compliant, and eight months later somebody replaces it with a fresh untagged export under the same address. Without a scheduled re-test the City believes it is compliant and is not. That is the regression line on the reporting page, and in ECI's experience it is never zero.